Library/Classroom/Readiness Lab — Wall Plan

READINESS LAB — WALL PLAN

Teaching aids for the 10 × 20 ft shared classroom

Draft v0.1 · For install · Awaken Innovation Lab · 29 November 2026


0. What this is

A wall scheme for the shared CS and ICT room, with the artwork already drawn at A2 and a 3D model showing every sheet in position.

ItemDetail
Room10 ft wide × 20 ft long × 9 ft ceiling
Fixed features70 in monitor on the front wall; whiteboard front-left; door back-left; 6.3 ft charging shelf across the back
Arrangements12 at a 3 × 12 ft long table (default) · 12 in three rows · 8 at four desks. Switch in the 3D room
Right wallFree — used here for the ICT sequence
Artwork13 A2 sheets + one 1200 × 300 mm banner
Print filesposters/ — one PDF per sheet
Scaled planwall-plan.pdf — 3 pages, 1 ft = 11 mm
3D roomclassroom-3d.html — posters placed on the walls
Regeneratenode build/make-classroom-walls.js

Download the set: posters/ · wall-plan.pdf · 3D room


1. The logic of the walls

The room changes session, so the walls are zoned rather than themed.

ZoneWallContentWhy here
Teaching wallFrontMonitor, today's objective, CS/ICT session board, bannerEverything a student needs at the start and end of a lesson is behind the teacher
CS wallLeftFlowcharts, four states, six blocks, debug protocolUsed while building; the whiteboard is next to it for live drawing
ICT wallRightFour functions, files, spreadsheets, email, securityThe longest uninterrupted run of wall, seen by every seated student
Entry and exitBackFour rules, charging and storage, above the shelfRead on the way in and on the way out
Student spaceLeft 12 ft 6 in → back; right 13 ft 6 in → backBug wall and progress boardLeft blank on purpose; the students fill it

Why not put everything on the front wall: a 10 ft wall with a 5 ft monitor leaves 2 ft either side. It holds two A2 sheets, not ten. The side walls are the teaching surface; the front wall is the attention surface.

1.1 The default arrangement is the long table

The room opens in the 12-seat long-table layout: one 3 × 12 ft table down the centre, six seats a side. It is a mode, not a permanent rebuild — the rows layout returns for lessons that need everyone facing the monitor, and the 8-seat layout for smaller groups.

That has a direct consequence for the walls:

In the long-table layoutWhat it means
Students face each other across the tableThe front monitor is side-on to everyone; it is a reference screen, not a lectern
The CS wall is behind the left row; the ICT wall is behind the right rowSide-wall posters are read before and after the lesson, or by the teacher walking the two side aisles — not while seated
Circulation is 2.1 ft down each sideThe teacher supervises by leaning in; there is no central aisle
The back wall is in viewLab rules and charging remain useful; keep the two most-used references on the front and back walls

So the side walls still carry the full sequences, but the front and back walls carry the aids that must be readable during table work: today's objective, the session board, the rules and the charging routine. If a lesson depends on students reading the four-state table while seated at the table, the teacher either moves that sheet to the front for the lesson or issues it as a handout.


2. Placement schedule

Heights are to the centre of each sheet. A2 landscape = 1.95 × 1.38 ft.

CodeSheetWallPosition along wallHeightPrint
BANNERReadiness LabFrontcentred, above monitor7 ft 5 in1200 × 300 mm
SH-04Today (dry-wipe)Front3 ft 8 in left of centre4 ft 5 inA2
SH-05CS or ICTFront3 ft 8 in right of centre4 ft 5 inA2
CS-01Flowchart symbolsLeft4 ft 7 in from front4 ft 7 inA2
CS-02Four statesLeft6 ft 11 in4 ft 7 inA2
CS-03Six blocksLeft9 ft 2 in4 ft 7 inA2
SH-01Debug protocolLeft11 ft 6 in4 ft 7 inA2
ICT-01Four functionsRight3 ft 0 in from front4 ft 7 inA2
ICT-02Files and namesRight5 ft 4 in4 ft 7 inA2
ICT-03SpreadsheetRight7 ft 7 in4 ft 7 inA2
ICT-04Email and researchRight9 ft 11 in4 ft 7 inA2
ICT-05SecurityRight12 ft 2 in4 ft 7 inA2
SH-02Four rulesBack5 ft 5 in from left4 ft 2 inA2
SH-03Charging and storageBack8 ft 1 in4 ft 2 inA2

Bottom edges: 3 ft 10 in for student-facing sheets; 3 ft 6 in above the charging shelf. Top edges: 5 ft 3 in. Nothing above 5 ft 3 in except the banner — higher aids stop being read and start being decoration.


3. The sheets

CodeFileWhat it does
CS-01cs-flowchart.pdfSix standard symbols and the five rules for drawing them
CS-02cs-four-state.pdfThe two-sensor table students write in Term 2 and run in Term 3
CS-03cs-blocks.pdfThe six constructs that carry the year; "if you use it twice, name it"
SH-01sh-debug.pdfSix-step debug protocol, shared by both programmes
ICT-01ict-functions.pdfInput, process, output, storage — with the touchscreen exception
ICT-02ict-files.pdfFolder tree, naming convention, copy vs move, 3-2-1 backup
ICT-03ict-spreadsheet.pdfCell references, the $ rule, six functions, chart choice
ICT-04ict-email.pdfFive parts of an email; five checks on a source
ICT-05ict-security.pdfSix habits, including AI acknowledgement
SH-02sh-lab-rules.pdfThe four rules at the entrance
SH-03sh-charging.pdfRobot and laptop storage above the shelf
SH-04sh-objective.pdfDry-wipe frame: outcome, exit ticket, words, week
SH-05sh-session.pdfWhat changes between a CS and an ICT session
BANNERbanner.pdfRoom identity above the monitor, 1200 × 300 mm

4. Installing it

  1. Print on 200 gsm matt paper or mount on 3 mm foam board. A2 posters curl; a clip frame or foam board keeps the bottom edge flat against the wall.
  2. Use removable adhesive strips, not nails. The walls may contain conduit, and the layout will change after the first term.
  3. Put the two dry-wipe sheets in A2 snap frames. SH-04 and SH-05 are written on every lesson; paper will not survive a term.
  4. Work from the plan, not from the 3D. The 3D is for agreement; the dimensions are for the drill and the tape measure.
  5. Leave the two free zones empty. The bug wall and the progress board are student-owned, and they are the only places where work can be added without moving a poster.

Sightlines. A2 at 4 ft 7 in centre is readable from 10–12 ft — the full length of the room — if the text is 24 pt or larger. The artwork uses 15 pt body and 40 pt titles, so the near half of the room reads comfortably and the far half reads the titles. That is the intended hierarchy: titles orient, the near wall teaches.


5. Using the walls in a lesson

MomentCS sessionICT session
StartSH-04 states the outcome; monitor shows the tableSH-04 states the outcome; monitor shows the file name
DemonstrationPoint to CS-01 or CS-02 rather than redrawing itPoint to ICT-03 rather than repeating a formula
Independent workStudents look up at CS-01/02/03 instead of asking "what was the block?"Students look up at ICT-02/03 instead of asking where to save
When it breaksSH-01: walk to the wall, read step 1 aloudSame sheet; the protocol is identical
EndSH-04 exit ticket; SH-03 robot back in the boxSH-04 exit ticket; ICT-02 folder check
Entry and exitSH-02 at the doorSH-02 at the door

The rule for the teacher: if you answer a question that is already on the wall, point at the wall instead. A poster that is read once and never used is a poster that should not be there.


6. Assumptions and limits

  • The door and whiteboard positions are taken from the 3D model, which marks them as assumptions. Measure before drilling or fixing.
  • The right wall is treated as free, as confirmed.
  • No window is assumed. If there is glazing on the right wall, move ICT-01 and ICT-02 to the back-right and drop ICT-05 to the left wall after SH-01.
  • The charging shelf is assumed 3 ft high and 6.3 ft wide. If it is taller, the two back sheets move up until their bottom edge clears it by 4 in.
  • The long table is a layout mode, not extra furniture. It replaces all six desks in the 12-seat layout; the row layout and the 8-seat layout are unchanged. If the centre must keep a clear 3 ft aisle, use the rows mode for that lesson rather than narrowing the side aisles.
  • The 3D room is a placement model, not a lighting or acoustic design.

Readiness Lab wall plan · Draft v0.1 · Awaken Innovation Lab · 29 November 2026